Sector 13 ID-E Calendar

Dec
21
Tue
APS Storage Ring Long Term Maintenance
Dec 21 2021 @ 8:00 am – Feb 1 2022 @ 8:00 am

APS Storage Ring Long Term Maintenance, Dec 21, 8am – Feb 1, 8am

Feb
1
Tue
IDE : Setup
Feb 1 all-day

IDE : Setup

Feb
2
Wed
IDE : Inhouse
Feb 2 all-day

IDE : Inhouse

Feb
4
Fri
IDE : Wadhwa, GUP-77174
Feb 4 all-day

IDE : Wadhwa, GUP-77174. “Correlated investigation of Fe valence, H2O abundances and D/H ratios in lunar meteorites and Apollo samples: Implications for volatiles and redox evolution on the Moon”, Feb 4 (9am) – Feb 6 (8am)

Feb
7
Mon
APS Storage Ring Maintenance
Feb 7 all-day


APS Storage Ring Maintenance

Feb
8
Tue
IDE : ESRP – D Nead GUP-77558
Feb 8 all-day

IDE : ESRP – D Nead GUP-77558, “ESRP: Using particulates on honeybees and in their byproducts as a measure of local pollution”

Feb
9
Wed
IDE : ESRP – E Aldana GUP-77781
Feb 9 all-day

IDE : ESRP – E Aldana GUP-77781, “ESRP: Using X-Ray Fluorescence and Absorption Spectroscopy to Analyze The Relationship Between Particulate Matter And The Environment Through Factors Of Metal Type And Particle Size”

Feb
10
Thu
IDE : Tschauner – GUP-70185
Feb 10 all-day

IDE : Tschauner – GUP-70185 *, “Ultrahigh-pressure inclusions in impact-diamonds”

Feb
11
Fri
IDE : A Bell – GUP-76840
Feb 11 all-day

IDE : A Bell – GUP-76840,  “The Angrite Redox Conundrum – Investigating the Redox Record of Angritic Meteorites with XANES Spectroscopy”

Feb
14
Mon
APS Storage Ring Maintenance
Feb 14 all-day


APS Storage Ring Maintenance